Hi,
I am running NPM version 2011.1.0 and I am having probelms with the report writer.
Basically, I am using the daily node availability report and changing the dates so that it does a months worth between the 17th of each month. I have also tried doing this on the availablilty reports....
What i am seeing is thus:
If I run the default reports and dont change the dates everything is fine. If I change the dates so that it crosses over 2 months then I only see a subsection of my nodes that are being monitored. For instance nodes 1 to 10 show up in July and nodes 10 to 20 show up in August.
Has anyone got any ideas how to solve this? I am supposed to be supplying the board of directors with these reports but they are unusable at the moment.
thanks in advance for any help.
Paul