Greetings -
Another Alert Automation Question. I am trying to setup an alert automation to assign 95% utilized to all of my production Windows nodes. I put together a query to try and break down just the prod Windows nodes and wanted to see if there is a better way to do this. We kind of have a naming convention and have been working on that the best I can.
With this below I am grabbing only Prod Windows nodes.

This is the trigger -

I have these configured to write to NetPerfMon so I can run a report on this daily on what nodes were assigned drive space utilization.
Just looking for suggestions or adjustments I can make on these. Thanks! -Dave