Hey!
I'm running Orion NPM 9.5.1 and NCM 5.5 as a module (not 5.51).
I started to upgrade the NPM to v.10 but got an error message saying that NCM 5.5 is not compatible and I have to upgrade it to 5.51 or later.
My question is, is this upgrade procedure ok?:
1. Upgrade NCM from 5.5 -> 6 using the SolarWinds-Orion-NCM-v6.0-Server-DL500.exe
2. Run the Solarwinds-Orion-NCM-v6.0-NPM-Integration.exe
3. Upgrade Orion from 9.5.1 to 10 with the SolarWinds-Orion-10.0-SL2000.exe
With thanks in advance,
Ivar