Hi,
My scenario is that we have windows server nodes being put into scheduled downtime for patching etc.
We also have switches with network interfaces and storage devices with fibre channel links to those nodes
The team puts the devices into scheduled downtime however the network switches and the storage fibre channel links then raise alerts when the nodes are brought down.
I am trying to determine if it is possible to link the node and remote interfaces/fibre channels somehow so that they all go into scheduled downtime with the node
Stuart.