I have been moving our additional pollers lately onto new hardware. This has been straight forward - I have just been installing another poller, and then using poller load balancing to move all the monitored devices onto the new poller (poller load balancing prompts you to remove the old poller from the engines table when there are no devices left).
I've now come to the primary poller which also has a number of modules installed (VoIP, APM and Netflow). I'm assuming that I can't install another instance as I have been with the additional pollers. If that is correct, what is the best process to move the primary poller and the modules?
I was thinking of shutting down the primary server, removing the row from the engines table manually, and then doing a new install on the new hardware (including all the modules). Then as a last step using the poller load balancing function to move the devices. Is this the most logical/best method? Does anything need to be done for APM and VoIP?
Dave.