Current configuration on server1: NPM 10.1.1, APM 3.5, NCM 6.1, NTA 3.7, IVM 1.0.0.
server2: SQL 2005 Std
We would like to move APM to its own server to lessen the polling load on server1. We have 2 new servers (physical) to put the apps on. We are also licensed for the Enterprise Operations Console.
Our goal is to have NPM NCM, NTA on one box and APM and possibly the Ops console on another. The database will remain in server2. We will be upgrading to the latest licensed version at the same time.
What is the best way to do this without losing configuration and historic data. And minimizing down time? Do we install APM on the new server and uninstall from the old? Am aware about exporting and importing certs.
I am thinking it might be better to migrate everything to one new server, and then split off APM.
Any help would be appreciated. I have about 20 days left in the lab environment to get this tested and documented, and ready for production install.