Hello everyone.
I am posting here in hopes that someone might be able to help me with a migration that I have planned as I have tried support and they keep pointing me at the upgrade advisor.
I need to move my NPM 11.0.1 and NTA 3.11 from the existing Server 2003 R2 32bit server to my new 2012 R2 64bit server. I need to keep the ip and hostname the same as alot of network gear is tied to the ip address for monitoring and I don't want to touch each device in the network to change the IP address (I did just buy NCM but have not installed it).
I have seen articles on how to keep the same hostname but I would also like to update NPM and NTA to the latest versions. There is alot that appears I need to do and I am not sure on where to start with this. I have the 2012 server built and ready to go. I am just not sure on the next steps. Is it install SQL Express then NPM and NTA? I know that NTA 4 now has some new requirements. To be honest i would rather stay on 3.11 but I don't think I can do that (again, not sure).
Is there someone out there that has already been through this and can perhaps offer up their experience on how to complete this migration and upgrade?
Please let me know if there is something else that you need to know.
Thanks in advance.