I have a running orion NPM
Running system
SQL 2000
1. Polling Engine (Engine Version 8.0.72 - Orion Version 8.0.1) & NPM on a Server 2003 (Orion Network Performance Monitor V8.0 SLX 8.0.67)
2. Polling Engine (Engine Version 8.1.3 - Orion Version 8.1.0) on a separate Server 2003
Now I like to change the servers and do a Upgrade while holding the interrupt as short as possible
I will migrate this system to 2008 servers and to the most up to date 10 NPM Version
SQL 2008
1. Polling Engine & NPM on a 2008 Server
2. Polling Engine on a 2008 Server
My question is, what is the fastest way (with the shortest interrupt) to get there?
kljlkj