I did a P2V conversion on my NPM 9.5 SP2 and put it on the hardware (now 2008 Hyper-V Core) it used to reside on. However, when I add the hyper-v host server it adds fine but as soon as the wizard is complete the status switches from Up to Down (which is obviously is not since then NPM would be down, too).
It seems that SNMP is working so perhaps it is an ICMP issue (?)
Anyone know the fix?
BTW: It also classifies all my 2008 R2 Core servers as NT.