Hi
We are having some trouble with a Scheduled Tasks job that does not always stop when it is finished, so we have to manually stop the job.
I tried to set up monitoring, but I am struggling to get the alert to trigger. Is there a way to set a time limit on a Scheduled Tasks job, and if the job exceeds the specific time, it triggers an alert?