We're currently running NCM 5.1 with the database on a second server (MS SQL v8). I need to do two things:
1) Move the database to a different SQL server
2) Upgrade to NCM 6.1
Is there a recommended process for this? I want the 6.1 to run on the same server that the 5.1 runs on now. Should I move the database first, then upgrade the NCM? Other way around?