Comments
-
Can this get some love in 2017? It has been here for 2+ years!
-
I started off learning about repairing some Odyssey2 controllers. I wanted to play, but the cables were broke. My grandfather opened it up, explained how it was all just some basic hardware, and we can solder the wires back in to place. I was 5 or 6 at the time. This sparked an interest in electronics a lot deeper than any…
-
Being able to have 10 nodes in testing would let me show my Director that the new package is working, and I can deploy it. RFC around here is a real PITA. Buying a 2nd Licence to prove the first is worth it, is really hard to swing with mgmt. We have a NPM150 for testing. I don't like the idea of "spin up a new one on the…
-
Yes please....
-
The upgrade went well, the new installer, brilliant. It was nice to only have one file, instead of 4, on each server. I feel the new Manage Entries page wastes a ton of real estate on large icons, thick rows, and lots of white-space, that annoying square loading box, the new filter part and display make it hard to sort the…
-
Turns out it is actually some code on the page that is timing out the monitor. We are working to get this resolved.
-
I figured it out
-
I have several teams that have volumes monitored. Each team wants a report sent to them listing how much space is left on each drive, in descending order. We give each node a "workGroup". Where do I need to stick something that would only show workgroup Like 'IDM'
-
The product owes us an update as we paid maintenance on it. Just saying...I won't be putting this on the list next year for renewal without. We pay you yearly to keep it up. At least make it functional with your current products.
-
To be perfectly honest, it is going the wrong direction. The new "manage nodes" interface I shutoff, I revert to the old. OpenGL issues, when I try to open the "new" manage nodes section, that stopped after a patch, but still the interface doesn't let me do any admin work faster. It is all more clicking, more gui…
-
Trying to convince my mgmt we can move away from NetMRI to NCM. This is a feature that the engineers don't wanna let go. If I can find a way to do it with NCM, I can push for the migration.