Comments
-
Yes, Only 2 nodes are required for a Cluster. Here is the process that will be needed. https://learn.microsoft.com/en-us/sql/sql-server/failover-clusters/install/sql-server-failover-cluster-installation?view=sql-server-ver17
-
Pretty Cool backpack
-
I not able to send a screenshot due to the security policy at my job but when looking at one of my Polling engines it is showing that the last database sync was 652080 minutes ago.
-
I received a trial license for HCO. Would this give me a temporary time frame to sync my APE with my database?
-
Thank you. Yes at this time we do have subscription based licensing but plan to switch to HCO. I have noticed that my MPE still syncs with the database. How is this still possible?