5 Replies Latest reply on Mar 16, 2015 10:55 PM by adriane27

    FTP Voyager + scheduled task that never ends

    igaulin@gox.ca

      Hi,

       

      I installed the FTP Voyager software on a server on a 2nd site. Everything has been configured on site 1 and is working as intended. I configured everything the same way on site 2nd site and the task never ends. I tried a backup and a sync with and without other tasks (emails on success/failure), nothing works. It does the job as insrtucted but the task never ends meaning the next day, the backup will never run.

       

      How can I fix this?