    NPM/NCM migration to new server

    reheindel

      Looking for guidance, and any known gotchas for the following:

      Running NPM 10.1.2 SP1 & NCM 6.1 on Windows 2003 (server-a)

      Backend databases reside on SQL 2005 (dbserver-a).

      We are looking at installing NPM 10.1.3/NCM 6.1 on a new server running Windows 2008 (server-b).

      We are not changing the backend database at all.

      Is it as simple as just running the install and configuration wizards, and point to the DB server?

      Is there any database structure changes that will cause me issues if I fall back to the previous 10.2.1 SP configuration (server-a)?

      Thanks in advance for your help!