If i load the trial version, integrate it with our licensed NPM install, start populating it with networks etc, 30-day IPAM trial expires, then 3 months later we get our funding for a licensed version of IPAM, will the data I collected durring the trial period be gone leaving me to start over? Hope that makes sense.
thanks