0 Replies Latest reply on Aug 22, 2018 4:54 AM by pondus83

    Scheduled Tasks job

    pondus83

      Hi

       

      We are having some trouble with a Scheduled Tasks job that does not always stop when it is finished, so we have to manually stop the job.

      I tried to set up monitoring, but I am struggling to get the alert to trigger. Is there a way to set a time limit on a Scheduled Tasks job, and if the job exceeds the specific time, it triggers an alert?