14 Replies Latest reply on Mar 21, 2016 10:27 AM by svucic

    NPM and NCM upgrade considerations

    svucic

      Hi,

       

      I have taken over Solarwinds NPM and NCM from colleague, and I need to make upgrade to the newest versions of both product.

       

      Is there anything I need to consider with saving modifications to some part of NPM or NCM?

      Maybe some alerts or something else?

      I don't have information if system has something customized, so I wan't to check everything I can so I don't loose something important after upgrade.

      Or is everything preserved from one version to another with upgrade?

       

      Best regards,

      Stjepan