Baseline config migration during an upgrade to NCM 7.9

Jump to solution

Hi

Any one upgrate large NCM 2000+ nodes to 7.9 ?

I don't like when SW AUTO enable  features..

"If you have a large number of baselines, baseline migration can increase the time required to upgrade."

I sure like to know how long that take is there any way to skip to so nodes ?

Tags (1)
0 Kudos
1 Solution

Sounds like it should be pretty quick for you, we are only look for configs that have been marked as baseline. Anything else is outside of the scope for this migration.

View solution in original post

3 Replies
Level 12

In this case we are migrating the old 1:1 baselines into the new baseline management feature. It allows us to preserve your environment as is, but also give you access to all the new features.

The duration depends on the number of configs (baselines) and the size of those said baselines. There is no way to skip nodes or the process.

0 Kudos

I dont have any "baseline " but I sure have alot of nodes backup some are "running" some are not..

Does it need to run baseline  over all type backup ?

For exspl.

Have have speciel backups that look for HW change ...is that will baseline ?

That will take some time ...

0 Kudos

Sounds like it should be pretty quick for you, we are only look for configs that have been marked as baseline. Anything else is outside of the scope for this migration.

View solution in original post